Library Constraction Records of the Water tank

2009/3/11
Inside of the tank
The work stand is used for the detector construction.
2009/2/26
Under the water filling test
2009/2/5
A spiral staircase was installed.
2009/1/22
From top of the tank. The cross bars are installed.
2009/1/14
From top of the tank. The ceiling plates will be installed.
2009/1/6
From top of the tank. The ceiling plate will be installed on the this frame.
2008/11/28
The fifth board. The welding of the joint of the stainless steel board has started.
2008/11/21
The fourth piece stainless steel board was piled up.
2008/11/20
The third piece stainless steel board was piled up. They are connected temporally, and welded each other.
2008/11/20
The second piece stainless steel board was piled up.
2008/11/18
From top of the tank.
2008/11/18
In the tank a work stand is installed to construct the detector.
2008/11/12
δΈ€The one piece of stainless steel board is piled up.
2008/11/7
The bottom of the tank is installed.