Photo Album
These photographs can be used for your publication under the conditions, described here.
High resolution photo selected for publication
Click on photograph to see large size file.
Super-Kamiokande Construction(1993~1996)
 |
 |
 |
 |
No.1
Water-filling(Jan. 1996) |
No.2 |
No.3 |
No.4
Checking PMTs |
 |
 |
 |
 |
| No.5 |
No.6 |
No.7 |
No.8
Mounting bottom PMTs |
 |
 |
 |
 |
No.9
Mounting barrel PMTs |
No.10
Mounting barrel PMTs |
No.11
Mounting top PMTs(Jun. 1995) |
No.12
Mounting stainless boards(Jan.1995) |
▲Up
Full Reconstruction(2006)
 |
 |
 |
 |
No.13
Inside of the detector with nearly full-PMTs.(Apr. 7, 2006) |
No.14 |
No.15
Started water-filling(Apr. 23, 2006) |
No.16
Nearly full water. From the upper of the tank(Jun.26, 2006) |
▲Up
Kamiokande(1983~1996)
 |
 |
No.Kam1
Kamiokande detector |
No.Kam2
Kamiokande detector. Form the bottom. |
▲Up
Super-Kamiokande Construction
 |
 |
 |
 |
No.SK1-
Dome of the detector(Jun. 93) |
No.SK1-2
Cavity for the detector |
No.SK1-3
Top of the SK detector (before lifting up)(Jul.95) |
No.SK1-4
People contributing to the construction 1 (Jul. 95) |
 |
 |
 |
 |
No.SK1-5
Top of the detector (outside, before lifting up(Jul. 95) |
No.SK1-6
Top of the detector (inside, under lifting up)(Jul. 95) |
No.SK1-7
Making a PMT-unit |
No.SK1-8
Rear view of PMT units |
 |
 |
 |
 |
No.SK1-9
Mountings the PMTs on the detector wall. |
No.SK1-10 |
No.SK1-11 |
No.SK1-12 |
 |
 |
 |
 |
No.SK1-13
Detector wall |
No.SK1-14
A part of the wall-outer detector |
No.SK1-15
Detector wall and bottom |
No.SK1-16 |
 |
 |
 |
 |
No.SK1-17
working party at the bottom of the tank 1 |
No.SK1-18
working party at the bottom of the tank 2 |
No.SK1-19
detector wall and top with about 9000 PMTs |
No.SK1-20
detector wall about 9000 PMTs |
 |
 |
 |
 |
No.SK1-21
entrance to the top of the detector |
No.SK1-22
top of the detector 1 |
No.SK1-23
top of the detector 2 |
No.SK1-24
working party at the bottom of the tank 2 |
 |
 |
 |
 |
No.SK1-25
cabling at the top of the detector 1 |
No.SK1-26
cabling at the top of the detector 2 |
No.SK1-27
electronics and HV system |
No.SK1-28
rear view of the electronics and HV system |
 |
 |
 |
 |
No.SK1-29
people contributing to the construction 2 |
No.SK1-30
people contributing to the construction 3 |
No.SK1-31
entrance to the Kamioka underground lab. |
No.SK1-32
Water-filling was started on December 22, 1995. |
 |
 |
No.SK1-33
inner detector with half of water (Feb. 96) |
No.SK1-34
installation of last PMT module of the inner detector (Mar. 96) |
▲Up
Full Reconstruction (Aug. 2005~July 2006)
 |
 |
 |
 |
No.SK3-1
Assembling PMT case 1 |
No.SK3-2
Eye check of PMTs |
No.SK3-3
Assembling PMT case 2 |
No.SK3-4
Mounting the top PMTs 1 |
 |
 |
 |
 |
No.SK3-5
Mounting the top PMTs 2 |
No.SK3-6
Mounting the barrel PMTs 1
|
No.SK3-7
Mounting the barrel PMTs 2 |
No.SK3-8
Mounting the barrel PMTs 3 |
 |
 |
 |
 |
No.SK3-9
Mounting the barrel PMTs 4 |
No.SK3-10
Completed mounting PMTs 1(Apr. 7, 2006) |
No.SK3-11
Completed mounting PMTs 2 |
No.SK3-12
Completed mounting PMTs 3 |
 |
 |
 |
 |
No.SK3-13
Completed mounting PMTs 4 |
No.SK3-14
Completed mounting PMTs 5 |
No.SK3-15
Cable connection |
No.SK3-16
Outer detector |
 |
 |
 |
 |
No.SK3-17
Replacing Tyvek sheets |
No.SK3-18
Started filling water 1 (Apr. 23, 2006) |
No.SK3-19
Started filling water 2 |
No.SK3-20
Started filling water 3 |
 |
 |
 |
No.SK3-21
Nearly full water(Jun. 26, 2006) |
No.SK3-22
Mounting final PMT module 1 |
No.SK3-23
Mounting final PMT module 2 |
▲Up