背景1
背景2

Photo

Photo

Copyright of all images or publications on this web site belong to Kamioka Observatory, ICRR (Institute for Cosmic Ray Research), The University of Tokyo. If you would like to use them, please read the Terms of Use.

Super-Kamiokande Construction(1993~1996)

No.1注水中

No.1
Water-filling (Jan. 1996)

No.2

No.2

No.3

No.3

No.4

No.4
Checking PMTs

sk05

No.5

No.6

No.7

sk07

No.8
Mounting bottom PMTs

No.9
Mounting barrel PMTs

No.10
Mounting barrel PMTs

No.11
Mounting top PMTs (Jun. 1995)

No.12
Mounting stainless boards (Jan.1995)

Full Construction(2006)

No.13
Inside of the detector with nearly full-PMTs. (Apr. 7, 2006)

No.14

No.15
Started water-filling (Apr. 23, 2006)

No.16
Nearly full water. From the upper of the tank (Jun.26, 2006)

Kamiokande Detector(1983~1996)

No.Kam1
Kamiokande detector

No.Kam2
Kamiokande detector from the bottom

Super-Kamiokande Construction(1993~1996)

No.SK1-1
Dome of the detector(Jun. 93)

No.SK1-2
Cavity for the detector

No.SK1-3
Top of the SK detector (before lifting up)(Jul.95)

No.SK1-4
People contributing to the construction 1 (Jul. 95)

No.SK1-5
Top of the detector (outside, before lifting up(Jul. 95)

No.SK1-6
Top of the detector (inside, under lifting up)(Jul. 95)

No.SK1-7
Making a PMT-unit

No.SK1-8
Rear view of PMT units

No.SK1-9
Mountings the PMTs on the detector wall.

No.SK1-10

No.SK1-11

No.SK1-12

No.SK1-13
Detector wall

No.SK1-14
A part of the wall and the outer detector

No.SK1-15
Detector wall and bottom

No.SK1-16

No.SK1-17
working party at the bottom of the tank 1

No.SK1-18
working party at the bottom of the tank 2

No.SK1-19
detector wall and top with about 9000 PMTs

No.SK1-20
detector wall with about 9000 PMTs

No.SK1-21
entrance to the top of the detector

No.SK1-22
top of the detector 1

No.SK1-23
top of the detector 2

No.SK1-24
working party at the bottom of the tank 2

No.SK1-25
cabling at the top of the detector 1

No.SK1-26
cabling at the top of the detector 2

No.SK1-27
electronics and HV system

No.SK1-28
rear view of the electronics and HV system

No.SK1-29
people contributing to the construction 2

No.SK1-30
people contributing to the construction 3

No.SK1-31
entrance to the Kamioka underground lab.

No.SK1-32
Water-filling was started on December 22, 1995.

No.SK1-33
nner detector with half of water (Feb. 96)

No.SK1-34
installation of last PMT module of the inner detector (Mar. 96)

Full Construction(Aug.2005~Jul.2006)

No.SK3-1
Assembling PMT case 1

No.SK3-2
Eye check of PMTs

No.SK3-3
Assembling PMT case 2

No.SK3-4
Mounting the top PMTs 1

No.SK3-5
Mounting the top PMTs 2

No.SK3-6
Mounting the barrel PMTs 1

No.SK3-7
Mounting the barrel PMTs 2

No.SK3-8
Mounting the barrel PMTs 3

No.SK3-9
Mounting the barrel PMTs 4

No.SK3-10
Completed mounting PMTs 1(Apr. 7, 2006)

No.SK3-11
Completed mounting PMTs 2

No.SK3-12
Completed mounting PMTs 3

No.SK3-13
Completed mounting PMTs 4

No.SK3-14
Completed mounting PMTs 5

No.SK3-15
Cable connection

No.SK3-16
Outer detector

No.SK3-17
Replacing Tyvek sheets

No.SK3-18
Started filling water 1 (Apr. 23, 2006)

No.SK3-19
Started filling water 2

No.SK3-20
Started filling water 3

No.SK3-21
Nearly full water (Jun. 26, 2006)

No.SK3-22
Mounting final PMT module 1

No.SK3-23
Mounting final PMT module 2